Gantt Chart

Best for: project plans and roadmaps — tasks with explicit start and end dates, grouped into phases. Use when the reader needs to see temporal overlap, parallel tracks, and milestone sequencing at a glance.

Layout conventions

  • Left label column: x=20–200 (180px). Task names in Geist sans 11px 600. Phase labels as Geist Mono 7px eyebrows above each group.
  • Timeline area: x=200–960 (760px). Time axis runs left→right.
  • Row height: 40px per task. Each bar occupies h=24px centered in the row (8px top padding).
  • Time axis: Geist Mono 8px week/month labels at x=200+i×pitch, y=56 (just above first task row). A hairline separator at y=64.
  • Phase grouping: a subtle zone rect (same pattern as architecture zone) behind each phase's rows, with an eyebrow label in the top-left margin. Use rgba(45,49,66,0.02) fill, rgba(45,49,66,0.10) stroke.
  • Focal task bar: 1 bar in accent fill/stroke (the key deliverable or critical path task). All others: muted fill @ 0.15, muted stroke.
  • Today / milestone marker: optional vertical dashed line in muted at the current week x-position.

Task bar pattern

<!-- Non-focal task -->
<rect x="X_start" y="ROW_Y+8" width="DURATION_PX" height="24" rx="4"
      fill="rgba(79,93,117,0.15)" stroke="#4f5d75" stroke-width="1"/>
<text x="X_start+8" y="ROW_Y+25" fill="#2d3142" font-size="10" font-weight="600"
      font-family="'Geist', sans-serif">Task name</text>

<!-- Focal task -->
<rect x="X_start" y="ROW_Y+8" width="DURATION_PX" height="24" rx="4"
      fill="rgba(235,108,54,0.12)" stroke="#eb6c36" stroke-width="1"/>
<text x="X_start+8" y="ROW_Y+25" fill="#eb6c36" font-size="10" font-weight="600"
      font-family="'Geist', sans-serif">Key task</text>

Duration in pixels: (end_week - start_week) × pitch. Pitch = timeline_width / total_weeks.

Anti-patterns

  • More than 12 tasks (splits into sub-plans or collapses into phase-level view).
  • More than 5 parallel tracks per phase (illegible overlap).
  • Dependency arrows between tasks in v1 (add only when essential; use the annotation primitive for labels).
  • Start/end dates in the bar label (put them in the x-axis or tooltip comment instead).
  • Equal visual weight for all bars (the focal task must stand out).